The City of Talladega, Alabama

Completed Airport Projects

 

COMPLETED TALLADEGA AIRPORT PROJECTS SINCE 2000

 

FY 2015          NORTH TAXIWAY CONNECTOR (At Northeast Corner of Cargo Apron)

 

FY 2014          TAXIWAY SEALCOAT / REMARKING PROJECT / EMER. ACCESS RD. TO APRON

 

FY 2013          CARGO / TRANSIENT APRON (PHASE 3)

 

FY 2013          RUNWAY SEALCOAT / REMARKING PROJECT

 

FY 2012          CARGO / TRANSIENT APRON (PHASE 2) 

 

FY 2011          INSTRUMENT LANDING SYSTEM FOR RUNWAY 3 APPROACH

 

FY 2011          WATER TANK REHABILITATION

 

FY 2011          CARGO / TRANSIENT APRON (PHASE 1)   

 

FY 2010          TERMINAL APRON REHABILITATION PROJECT; and

                          CONNECTOR TAXIWAY SEALCOAT AND MARKINGS

 

FY 2009          NEW CORPORATE HANGAR; and

                          BRICK ENTRANCE WALL

 

FY 2009          TERMINAL AREA Security Fencing Project; and

                          NEW PAPI Installation project

 

FY 2008          WILDLIFE (PERIMETER) FENCING;   “SMS” PLAN (Safety Study);

                          RUNWAY SAFETY AREA CLEARING AND GRADING (East Side of Airport);

                          EMERGENCY GENERATOR FOR AIRFIELD LIGHTING AND NAVAIDS; and

                          AIRPORT LAYOUT PLAN DRAWING (ALD) UPDATE

 

FY 2007          T-HANGAR DEVELOPMENT PROJECT (7-Bay Hangar, Aprons & Twys.)

 

FY 2007          PARALLEL TAXIWAY RELOCATION (PHASE 4) (Center Section)

 

FY 2006          PARALLEL TAXIWAY RELOCATION (PHASE 3) AND RUNWAY SHIFT (South End);  and SEALCOATING OF RUNWAY AND

                          NEW PAVEMENT MARKINGS

 

FY 2005          PARALLEL TAXIWAY RELOCATION (PHASE 2) (South End)

 

FY 2004          PARALLEL TAXIWAY RELOCATION (PHASE 1) (North End)

 

FY 2003          INSTRUMENT LANDING SYSTEM (FAA’s Original Earmark)

 

FY 2003        NORTH RUNWAY SAFETY AREA IMPROVEMENTS;

                        WETLAND MITIGATIONS;

                         ENVIRONMENTAL ASSESSMENT FOR PARALLEL TAXIWAY RELOCATION; and

                         NEW RUNWAY EDGE LIGHTING SYSTEM

 

FY 2002   –     AUTOMATED WEATHER OBSERVATION SYSTEM (AWOS – III);

                        SOUTH END RUNWAY SAFETY AREA;

                        WILDLIFE (PERIMETER) FENCING (EAST SIDE OF AIRFIELD); and

                        NEW ACCESS ROAD TO SEWAGE TREATMENT PLANT

 

FY 2001   –     RUNWAY GROOVING, NEW ROTATING BEACON; and

                        NEW RUNWAY END IDENTIFIER LIGHTS (REILs)

 

FY 2000   –     RUNWAY SAFETY AREA IMPROVEMENTS; and

                        RUNWAY AND TAXIWAY OVERLAY WITH NEW MARKINGS