The City of Talladega, Alabama

Completed Airport Projects

 

COMPLETED TALLADEGA AIRPORT PROJECTS SINCE 2000

 

FY 2015   –       NORTH TAXIWAY CONNECTOR (At Northeast Corner of Cargo Apron)

 

FY 2014   –       TAXIWAY SEALCOAT / REMARKING PROJECT / EMER. ACCESS RD. TO APRON

 

FY 2013   –       CARGO / TRANSIENT APRON (PHASE 3)

 

FY 2013   –       RUNWAY SEALCOAT / REMARKING PROJECT

 

FY 2012   –       CARGO / TRANSIENT APRON (PHASE 2) 

 

FY 2011   –       INSTRUMENT LANDING SYSTEM FOR RUNWAY 3 APPROACH

 

FY 2011   –       WATER TANK REHABILITATION

 

FY 2011   –       CARGO / TRANSIENT APRON (PHASE 1)   

 

FY 2010   –       TERMINAL APRON REHABILITATION PROJECT; and

                          CONNECTOR TAXIWAY SEALCOAT AND MARKINGS

 

FY 2009   –       NEW CORPORATE HANGAR; and

                          BRICK ENTRANCE WALL

 

FY 2009   –       TERMINAL AREA Security Fencing Project; and

                          NEW PAPI Installation project

 

FY 2008   –       WILDLIFE (PERIMETER) FENCING;   “SMS” PLAN (Safety Study);

                          RUNWAY SAFETY AREA CLEARING AND GRADING (East Side of Airport);

                          EMERGENCY GENERATOR FOR AIRFIELD LIGHTING AND NAVAIDS; and

                          AIRPORT LAYOUT PLAN DRAWING (ALD) UPDATE

 

FY 2007   –       T-HANGAR DEVELOPMENT PROJECT (7-Bay Hangar, Aprons & Twys.)

 

FY 2007   –       PARALLEL TAXIWAY RELOCATION (PHASE 4) (Center Section)

 

FY 2006   –       PARALLEL TAXIWAY RELOCATION (PHASE 3) AND RUNWAY SHIFT (South End);  and SEALCOATING OF RUNWAY AND

                          NEW PAVEMENT MARKINGS

 

FY 2005   –       PARALLEL TAXIWAY RELOCATION (PHASE 2) (South End)

 

FY 2004   –       PARALLEL TAXIWAY RELOCATION (PHASE 1) (North End)

 

FY 2003   –       INSTRUMENT LANDING SYSTEM (FAA’s Original Earmark)

 

FY 2003   –     NORTH RUNWAY SAFETY AREA IMPROVEMENTS;

                        WETLAND MITIGATIONS;

                         ENVIRONMENTAL ASSESSMENT FOR PARALLEL TAXIWAY RELOCATION; and

                         NEW RUNWAY EDGE LIGHTING SYSTEM

 

FY 2002   –     AUTOMATED WEATHER OBSERVATION SYSTEM (AWOS – III);

                        SOUTH END RUNWAY SAFETY AREA;

                        WILDLIFE (PERIMETER) FENCING (EAST SIDE OF AIRFIELD); and

                        NEW ACCESS ROAD TO SEWAGE TREATMENT PLANT

 

FY 2001   –     RUNWAY GROOVING, NEW ROTATING BEACON; and

                        NEW RUNWAY END IDENTIFIER LIGHTS (REILs)

 

FY 2000   –     RUNWAY SAFETY AREA IMPROVEMENTS; and

                        RUNWAY AND TAXIWAY OVERLAY WITH NEW MARKINGS